Residuals Handling Facility

Progress pictures of theĀ Residuals Handling Facility in Dickinson.

Rice Lake cleaning the decking for the 2nd story slab pour #2.

Rice Lake cleaning the decking for the 2nd story slab pour #2.

Unlimited Excavating installing fill material on the western side of the structure.

Unlimited Excavating installing fill material on the western side of the structure.

Looking west at installation of the second floor trench drain and construction joint bulkhead north of filter press 2.

Looking west at installation of the second floor trench drain and construction joint bulkhead north of filter press 2.

Looking west. Rice Lake removing form imperfections in the concrete along the south wall.

Looking west. Rice Lake removing form imperfections in the concrete along the south wall.

Looking east. Setting of masonry block on the south side of the 1st floor.

Looking east. Setting of masonry block on the south side of the 1st floor.

Looking south. Erection of the framework for the 2nd floor deck in progress.

Looking south. Erection of the framework for the 2nd floor deck in progress.

Looking west. Rice Lake removing forms from the columns placed earlier.

Looking west. Rice Lake removing forms from the columns placed earlier.

Looking west. Rice Lake setting forms for the first to second floor columns at grids 4 to 6.

Looking west. Rice Lake setting forms for the first to second floor columns at grids 4 to 6.